Instalation and exploitation

1. Transport and stocking

In order to avoid product damages before the installation all materials should be transported and stored in conditions preventing contact with water or moisture. Plastic packages aren’t waterproof. Materials should be stored in original packages on a flat, clean, dry and secured area till the moment of the installation. Do not place over 3 packages on each other. Be very careful while moving packages and if their weight and the size is big they should be moved by more than one person. Elements should be unpacked in closed rooms.

2. Installation site

The assembly can start when all construction works (plasters, electric, plumbing technical installations) are finished and the relative humidity of the air doesn’t exceed 90 % and the temperature isn’t lower than 7 ° C

3. Elements cutting

If structural elements require cutting,  this work should be performed with tools donated for this, using power saws is recomended.

4.Conservation and cleaning

All conservation and cleaning works should be done only when it is necessary. In order to perform cleaning correctly, keeping the initial appearance works should be done according to following recommendations:

First clean a dust using a delicate brush or the vacuum cleaner equipped with the finish for cleaning wallpapers.

Tracks of the pencil done during the assembly can be removed with the normal school rubber.

Possible streaks or the fingerprints can be cleaned using wet rag or sponge with delicate liquid soap or detergent mixed with water. The sponge should be moist, you mustn’t wet the ceiling.

WARNING: Do not use any abrasive materials to clean the ceiling, do not scratch or press cleaned elements.